CHOOSE A DIFFERENT MANUFACTURER 6


CHOOSE A DIFFERENT APPLIANCE

Buderus Hydronic Systems G115-4

ALL BLENDS (#2-B100) SETTINGS

Manufacturer:    Buderus Hydronic Systems
Appliance Series:    G115
Appliance Model:    G115-4
Burner Model:    EZ-1HP
Air Tube:    7" EZ-1
OEM Air Tube #:    50700
Insertion Depth:    4
Nozzle GPH:   0.65
Nozzle Type:    60ES
Nozzle Mfr:    Hago
Alternative Nozzle Type:    70AS
Alternative Nozzle Mfr:    Danfoss
Pump PSI:   150
Air Shutter:    Blank
Head Position:    [GPH 0.60/0.65] - (Position 1)
Air Setting:    [0.65 GPH] or (50% Open)
NOTES:   


B100 Field Conversion Guide

Use the below steps to convert a burner mfg before 11/20/2023 for optimization with all blends.

  1. Change Combustion Head Assembly* – Use Part No 77966S
    * Make sure combustion head has a gold C-clip (which designates that it is our B100 design.)
  2. Check/Replace Pump – Install Suntec Pump #3006B rated for B100
  3. Make changes highlighted in green above
  4. Check/Replace Control – Install ProX 70200 if the burner does not already have one.
  5. Check/Change Settings on ProX 70200**:
    • Flame stabilization:  5 seconds
    • CAD Ohms Max: 5300
    • Ignition Type: Smart Ignition
    • Motor Delay Off (Post-Purge): Minimum 15 seconds


** ProX 70200 controls manufactured after 11/20/23 will already have these settings.
Go to Top