CHOOSE A DIFFERENT MANUFACTURER 6


CHOOSE A DIFFERENT APPLIANCE

Columbia Boiler CBX 100WC-DV

ALL BLENDS (#2-B100) SETTINGS

Manufacturer:    Columbia Boiler
Appliance Series:    Casco Bay Series
Appliance Model:    CBX 100WC-DV
Burner Model:    EZ-1HP
Air Tube:    5" EZ-1
OEM Air Tube #:    97379
Insertion Depth:    1.75
Nozzle GPH:   0.85
Nozzle Type:    60B
Nozzle Mfr:    Delavan
Alternative Nozzle Type:    60W
Alternative Nozzle Mfr:    Delavan
Pump PSI:   150
Air Shutter:    Air Boot
Head Position:    [GPH 0.85/ 1.00] or (Position 3)
Air Setting:    [0.85 GPH] or (65% Open)
NOTES:   


B100 Field Conversion Guide

Use the below steps to convert a burner mfg before 11/20/2023 for optimization with all blends.

  1. Change Combustion Head Assembly* – Use Part No 77958S
    * Make sure combustion head has a gold C-clip (which designates that it is our B100 design.)
  2. Check/Replace Pump – Install Suntec Pump #3006B rated for B100
  3. Make changes highlighted in green above
  4. Check/Replace Control – Install ProX 70200 if the burner does not already have one.
  5. Check/Change Settings on ProX 70200**:
    • Flame stabilization:  5 seconds
    • CAD Ohms Max: 5300
    • Ignition Type: Smart Ignition
    • Motor Delay Off (Post-Purge): Minimum 15 seconds


** ProX 70200 controls manufactured after 11/20/23 will already have these settings.
Go to Top