CHOOSE A DIFFERENT MANUFACTURER 6


CHOOSE A DIFFERENT APPLIANCE

Columbia Boiler CSFH6210

ALL BLENDS (#2-B100) SETTINGS

Manufacturer:    Columbia Boiler
Appliance Series:    Casco Bay Series
Appliance Model:    CSFH6210
Burner Model:    EZ-2HP
Air Tube:    7" EZ-1
OEM Air Tube #:    95869
Insertion Depth:    2.5
Nozzle GPH:   1.75
Nozzle Type:    70AS
Nozzle Mfr:    Danfoss
Alternative Nozzle Type:    60ES
Alternative Nozzle Mfr:    Hago
Pump PSI:   130
Air Shutter:    4 slot
Head Position:    [GPH 1.65/1.75] or (Position 4.5)
Air Setting:    65%
NOTES:   


B100 Field Conversion Guide

Use the below steps to convert a burner mfg before 11/20/2023 for optimization with all blends.

  1. Change Combustion Head Assembly* – Use Part No 77966S
    * Make sure combustion head has a gold C-clip (which designates that it is our B100 design.)
  2. Check/Replace Pump – Install Suntec Pump #3006B rated for B100
  3. Make changes highlighted in green above
  4. Check/Replace Control – Install ProX 70200 if the burner does not already have one.
  5. Check/Change Settings on ProX 70200**:
    • Flame stabilization:  5 seconds
    • CAD Ohms Max: 5300
    • Ignition Type: Smart Ignition
    • Motor Delay Off (Post-Purge): Minimum 15 seconds


** ProX 70200 controls manufactured after 11/20/23 will already have these settings.
Go to Top